Under a multidisciplinary contract, Accera has completed a full house build on Skolelodsvej in Amager: a large villa built as a double house with two dwellings. The project was carried out in 2025–2026 and now stands finished, ready for the clients’ own interior finishes – including painting and flooring, which were not part of Accera’s delivery.
Accera was responsible for the house as a whole, from structures and facades to technical installations, windows and doors. The timber structure was built with two pitched roofs. Specially designed steel beams were lifted into place with a large crane, and 8-meter-high facades and 26 modules were installed, including assembly from 7 a.m. to 6 p.m. in changing winter weather with hard frost, sun and wind. The glass was later fitted with a vacuum lifter. Stairwells, light wells and the main staircase were cast in concrete, and sewer and drainage installations with pump wells were established. In parallel, Accera carried out electrical, plumbing, ventilation, carpentry and masonry works.
The project sits in a residential neighborhood in Kastrup and required close coordination of trades, equipment and the two dwellings in the same building.
Special challenges
The building is a large double house with tall facades, module assembly and heavy steel elements that had to be craned into place in a tight residential area. Assembly was also carried out in winter weather, and solutions had to be coordinated between two dwellings in the same building.
Special achievement
Under a multidisciplinary contract, Accera has delivered a complete house build and put the structure, facades, installations and glazing in place under demanding conditions. We are proud of the workmanship and of the collaboration on site.