Accera built the infrastructure, foundations and frame for a large summerhouse as a main contractor. The project included partial basement and a custom architectural build.
The details of the work included planning with architects and local municipality and preparing all details for setting the construction phase in motion. The site was excavated and all necessary plumbing, sewage, water and electrical was prepared before building the side walls and casting concrete.
The foundation works were done in 3 steps, first excavation, then technical details and lastly laying the stone walls and casting with concrete.
The basement walls and foundation are built with normal concrete stones, strengthened with steel and filled with concrete chosen according to the calculations. The upper walls and roof are constructed in wood and prepared for wind barriers and facade cladding. All the necessary technical installations were done in the ground pre-construction. Even though it’s a summerhouse, with less regulatory demands, the client has chosen to build it perfectly energy-optimized for the strict requirements in the Danish “Bygningsreglement 2018 / BR18”