Complete construction of new story on residential building block in Copenhagen. Several craftsmen trades have been involved to make the transformation from attic space, to fully completed and usable apartments.
Demolition and preparation of the area, which included a complete teardown of the existing roof construction, and creating the construction for the new load bearing elements. The whole enterprise revolved around a wooden beam construction with very large pieces of timber to support the deck and new 5th floor. The roof construction was prepared for enabling the construction of 15 new apartments in total, all with roof-integrated terraces in each apartment. The roof was finished with brick tiles and details intricately made with zinc & alu.
After the roof construction, the interior walls and the interior part was carried out, transforming the area to 15 individual apartments, extending the existing stairway, maintaining the existing look and feel of the whole staircase. In total, 15 bathrooms were installed, with waterproof barrier, concrete slab, tiles and finalization. All surfaces finalized with chosen materials.
The final result was stunning, with apartments that have 5 meters to the ceiling at some places, with a plethora of angles and cosy corners. Everything on top with a nice view over the rooftops of Copenhagen’s inner city.
Special challenges:
To work in the inner city of Copenhagen can be a challenging logistical assignment; if you then add the factor of working on the 5th floor, with a building full of inhabitants, then it becomes really challenging. The building site didn’t have sufficient space to store large amounts of materials, therefore all the materials were delivered according to a very tight delivery schedule and they needed to be hoisted up by either crane or lift, every time.
Special achievement:
In spite of the heavy logistical challenges we delivered the project with full alignment to the original time schedule. The timber used for the roof construction, was large and heavy and required some more traditional way of maneuvering the materials into position. Accera used rope hoists to lift the framework into mounting position, since robots, heavy machinery or large roof cranes was not possible in that tight area.